|
|
|
|
|
Bonus/penalty rules |
|
evaluated |
|
|
|
Procurement contracts often foresee penalty payments for the case that certain requirements (e.g. maximum maintenance costs) are not fulfilled by manufacturers. So-called bonus / penalty rules, i.e. additional agreements on bonus payments for the case of "over-performance", could improve the role of energy-relevant parameters such as efficiency of traction equipment or mass per seat in the design of railway vehicles.
|
|
Technology field: Management and organisation
|
|
|
|
|
|
|
|
|
General information
|
|
|
General criteria
|
|
|
Environmental criteria
|
|
|
|
|
|
|
|
|
|
|
Impacts on energy efficiency:
|
|
|
|
|
Energy efficiency potential for single vehicle: not applicable |
|
|
|
|
Energy efficiency potential throughout fleet: not applicable |
|
|
|
|
|
|
|
|
Other environmental impacts: positive |
|
|
Economic criteria
|
|
|
Application outside railway sector (this technology is railway specific)
|
|
|
Overall rating
|
date created: 2002-10-09 |
|
|
|
© UIC - International Union of Railways 2003 |
|
|
|