Vehicle - fix costs: strongly dependent on specific application |
|
|
|
|
|
An advanced traffic optimisation system would require some additional information and communication on-board equipment, such as GPS units, GSM-R transmitters and a software to display driving recommendation on the drivers' desk. Some of this equipment may already be deployed for other purposes in many fleets. Therefore the vehicle fix costs heavily depend on the technological point of departure. |
|
|
|
|
|
|
|
|
Vehicle - running costs: significant reduction |
|
|
|
|
|
(no details available) |
|
|
|
|
|
|
|
|
Infrastructure - fix costs: strongly dependent on specific application |
|
|
|
|
|
Just as in the case of vehicle fix costs the required
infrastructure investment strongly depends on the point of departure in a given
infrastructure. |
|
|
|
|
|
|
|
|
Infrastructure - running costs: unchanged |
|
|
|
|
|
- There could be slightly increased running costs due to a more complex
train control system. However, there could be reduced personnel costs due to
automation in train control.
- On the other, improved capacity and slot management could increase
the revenues of the infrastructure manager.
|
|
|
|
|
|
|
|
|
Scale effects: low |
|
|
|
|
|
(no details available) |
|
|
|
|
|
|
|
|
Amortisation: (no data) |
|
|
|
|
|
The amortisation time of an advanced traffic management system strongly
depends on the intial investment, cf. vehicle - fix costs and infrastructure
- fix costs. |
|
|