|
|
|
|
|
|
|
|
General information
|
|
|
General criteria
|
|
|
Environmental criteria
|
|
|
Economic criteria
|
|
|
|
|
|
|
|
|
|
|
Vehicle - fix costs: low |
|
|
|
|
|
The on-board hardware is generally cheap, especially if synergy effects with existing hardware (display etc) are used. Main cost factors are the digitalisation of track data and the software development. |
|
|
|
|
|
|
|
|
Vehicle - running costs: significant reduction |
|
|
|
|
|
If an automated and radio based data supply and updating is in place, additional operating costs are close to negligible. |
|
|
|
|
|
|
|
|
Infrastructure - fix costs: low |
|
|
|
|
|
There are generally no major infrastructure measures needed. However, a data supply infrastructure to update on-board data is required. |
|
|
|
|
|
|
|
|
Infrastructure - running costs: unchanged |
|
|
|
|
|
(no details available) |
|
|
|
|
|
|
|
|
Scale effects: low |
|
|
|
|
|
(no details available) |
|
|
|
|
|
|
|
|
Amortisation: 2 - 5 years |
|
|
|
|
|
(no details available) |
|
|
Application outside railway sector (this technology is railway specific)
|
|
|
Overall rating
|