|
|
|
 |
|
Bonus/penalty rules |
 |
evaluated |
 |
|
 |
Procurement contracts often foresee penalty payments for the case that certain requirements (e.g. maximum maintenance costs) are not fulfilled by manufacturers. So-called bonus / penalty rules, i.e. additional agreements on bonus payments for the case of "over-performance", could improve the role of energy-relevant parameters such as efficiency of traction equipment or mass per seat in the design of railway vehicles.
|
 |
Technology field: Management and organisation
|
 |
 |
 |
 |
 |
 |
 |
 |
General information
|
 |
 |
General criteria
|
 |
 |
Environmental criteria
|
 |
 |
Economic criteria
|
 |
 |
Application outside railway sector (this technology is railway specific)
|
 |
 |
Overall rating
|
date created: 2002-10-09 |
|
|
|
© UIC - International Union of Railways 2003 |
|
|
|