Usually energy supply for parked trains comes from the stationary grid. However, in some cases parked trains are supplied from the catenary for technical or operational reasons with corresponding high conversion losses in transformer and inverter equipment.
In the case of couple parked trains, two trains can be supplied via one pantograph with the electricity necessary for overnight heating by means of a software control tool (e.g. realized and installed on a number of trains by DSB). This eliminates the conversion losses of one of the trains. |
|
|
General criteria
|
|
|
|
|
|
|
|
|
|
|
Status of development: in use |
|
|
|
|
|
|
|
|
Time horizon for broad application: in < 2 years |
|
|
|
|
|
|
|
|
Expected technological development: basically exploited |
|
|
|
|
|
|
|
|
Benefits (other than environmental): none |
|
|
|
|
|
|
|
|
Barriers: medium |
|
|
|
|
|
|
|
|
Applicability for railway segments: low |
|
|
|
|
Type of traction: electric - DC, electric - AC
|
|
|
|
|
Type of transportation: passenger - main lines, passenger - high speed, passenger - regional lines, passenger - suburban lines
|
|
|
|
|
|
|
|
|
Grade of diffusion into railway markets:
|
|
|
|
|
Diffusion into relevant segment of fleet: < 5% |
|
|
|
|
Share of newly purchased stock: < 20% |
|
|
|
|
|
|
|
|
Market potential (railways): low |
|
|
Environmental criteria
|
|
|
Economic criteria
|
|
|
|
|
|
|
|
|
|
|
Vehicle - fix costs: low |
|
|
|
|
|
The costs are mainly limited to the development and installation of the software and the instruction of personnel. |
|
|
|
|
|
|
|
|
Vehicle - running costs: minor reduction |
|
|
|
|
|
(no details available) |
|
|
|
|
|
|
|
|
Infrastructure - fix costs: none |
|
|
|
|
|
(no details available) |
|
|
|
|
|
|
|
|
Infrastructure - running costs: unchanged |
|
|
|
|
|
(no details available) |
|
|
|
|
|
|
|
|
Scale effects: medium |
|
|
|
|
|
If large vehicle series can be equipped with the same software, there will be corresponding scale effects. |
|
|
|
|
|
|
|
|
Amortisation: < 1 year |
|
|
|
|
|
(no details available) |
|
|
Application outside railway sector (this technology is railway specific)
|
|
|
Overall rating
|
|
|
|
|
|
|
|
|
|
|
Overall potential: interesting |
|
|
|
|
Time horizon: short-term |
|
|
|
|
|
Connecting parked trains electrically to facilitate a common energy supply has a moderate to low energy efficiency effect. In addition, the potential of the measure is extremely limited both by the low applicability and by obstacles posed by the operation scheme. The measure is therefore judged only as "interesting" in a general context. Instead, efforts should be put on automatic control systems to optimise heating and lighting during overnight standstill. |