Technologies        
  Hauptmenu
 
    Introduction
    Database
    -  Technologies
  -  Projects
    Calendar
    Discussions
    Contact & Links
    Imprint & Disclaimer
    Sitemap
 
 


     
 
Content
 
back to list go back to technology list      previous previous technology  next technology  next

   Bonus/penalty rules  evaluated  
Procurement contracts often foresee penalty payments for the case that certain requirements (e.g. maximum maintenance costs) are not fulfilled by manufacturers. So-called bonus / penalty rules, i.e. additional agreements on bonus payments for the case of "over-performance", could improve the role of energy-relevant parameters such as efficiency of traction equipment or mass per seat in the design of railway vehicles.
Technology field: Management and organisation
open main section General information
open main section General criteria
open main section Environmental criteria
open main section Economic criteria
no data available Application outside railway sector (this technology is railway specific)
open main section Overall rating
References / Links:  Dongen, Fiechter 2000
Attachments:
Related projects:  Bonus/Penalty Rules in weight reduction;  PROSPER (Procedures for Rolling Stock Procurement with Environmental Requirements)
Contact persons:
 date created: 2002-10-09
 
 
© UIC - International Union of Railways 2003
 
Aktionmenu
 
 Your contribution
   add technology
 Views of this page
   show overview
   show evaluation
   show details
 Print options
   print data sheet
   print screen
 Help
   Evaluation briefing
   Technology list
    French - German