Projects        
  Hauptmenu
 
    Introduction
    Database
  -  Technologies
    -  Projects
    Calendar
    Discussions
    Contact & Links
    Imprint & Disclaimer
    Sitemap
 
 


     
 
Content
 
back to list go back to project list      previous previous project  next project  next

    08 Energy upgrade of buildings (offices, stations and workshops)  

Project type:
Implementation into fleet

Company:
DB AG, NS, Infrabel, Network Rail

Country:
Germany, Netherlands, Belgium, UK

Duration:
1-3 years (2012)

Project aims:
Energy audit and major overhaul of 31 selected stations across Germany as part of the measures within the framework of the “Konjunkturprogramm” as one example for major energy upgrades of buildings

Application area:
(no details available) vehicle(s)

Description:

Energy efficiency gains:

Primary energy savings of 33% on average or 13,7 GWh in total for all 31 stations:
- All buildings to meet the energy-related stipulations of the least EnEV
- Some stations surpass even EnEV of 2009.
- Excellent: Primary energy savings of 90% at the station Rosenheim

 

Costs (investment, operation, maintenance):

- The investment costs are not available.

- Cost reductions related to the reduced energy consumption (approx. 1 mio. € saved when the energy price is 75€/MWh)

 

Related technologies:

Energy audits, building renovation



References / Links:  DB stations
Attachments:
Related technologies:
Contact persons:  Thomas Klein (Deutsche Bahn AG)
 date created: 2012-10-19
 
 
© UIC - International Union of Railways 2003
 
Aktionmenu
 
 Your contribution
   add project
 Print options
   print screen