Projects        
  Hauptmenu
 
    Introduction
    Database
  -  Technologies
    -  Projects
    Calendar
    Discussions
    Contact & Links
    Imprint & Disclaimer
    Sitemap
 
 


     
 
Content
 
back to list go back to project list      previous previous project  next project  next

    CO2-controlled ventilation  

Project type:
Retrofit measure, Pilot project

Company:
NS

Country:
Netherlands

Duration:
(no details available)

Project aims:
Integration of demand-operated ventilation into old stock.

Application area:
2 vehicle(s)

Description:

NS Reizigers has carried out long-term measurements with provisional CO2-controlled ventilation equipment in two trainsets. The annual savings (assuming a normal Dutch winter) amounted to about 7250 kWh per coach. NS planned to include demand-operated ventilation based on CO2 sensors in one of the refurbishment projects of rolling stock for suburban service. However, the additional investment costs (ca 5000 EURO per coach) specified by the supplier were considered as too high and the feature was not realised.



References / Links:
Attachments:
Related technologies:  CO2-based demand control for coach ventilation
Contact persons:  Hr Wilco FIECHTER (NS Rezigers)
 date created: 2002-12-22
 
 
© UIC - International Union of Railways 2003
 
Aktionmenu
 
 Your contribution
   add project
 Print options
   print screen