|
|
|
 |
|
18 Control of switch heating
|
 |
|
Project type: |
no data
|
Company: |
SBB, ÖBB Infrastructure, ProRail, Tafikverket, Trenitalia
|
Country: |
Switzerland, Austria, Netherlands, Sweden, Italy
|
Duration: |
SBB: 2005- ongoing
ProRail: 2010 (?)- ongoing (new design in 2013)
|
Project aims: |
Main drivers: LCC and renewal of old switch heating systems (gas, electric - on/off mode only). Energy efficiency gains as a surplus
|
Application area: |
(no details available) vehicle(s)
|
Description: |
(no details available)
|
date created: 2012-10-22 |
|
|
|
© UIC - International Union of Railways 2003 |
|
|
|