01 Heat pumps (geothermal, soil reservoir, air-based)
|
Implementation into fleet
|
Netherlands
|
2011- (ongoing)
|
Savings on Coaches, Type Bpm
|
Retrofit measure, Pilot project
|
Switzerland
|
4 years
|
20 The Carbon ladder - contractor involvement
|
Implementation into fleet
|
Netherlands
|
Developed and in use since 2009.
|
Optimised Ventilation Control Re 4/4 II, Re 4/4 III
|
Retrofit measure, Implementation into fleet
|
Switzerland
|
End in 2004
|
11 Intelligent lighting management for railway depots
|
Pilot project
|
United Kingdom
|
For depots: implementation from...
|
A Driving Audible device for retrofitting onto non-ATO subway train to save traction energy
|
Retrofit measure, Pilot project
|
Hong Kong Special Administration...
|
It has taken around two years to...
|
16 Green data centres
|
Implementation into fleet
|
Germany, USA, UK and others
|
last 5 years
|
15 LED lighting systems for signalling
|
Implementation into fleet
|
Netherlands
|
long-term project until 2020
|
03 Upgrade of heating systems in stations, office buildings and workshops
|
Implementation into fleet
|
Netherlands, Belgium
|
Ongoing
|
02 Solar panels (PV) mounted on platform roofs, stations and/or workshops
|
Pilot project
|
Germany, UK, Netherlands
|
Ongoing (2012)
|
05 Check lists for good practise examples for shops/concessions in stations
|
Feasibility study
|
Netherlands
|
Ongoing (2012)
|
06 Optimising electric equipment in stations
|
Implementation into fleet
|
Germany, Belgium, UK, Switzerland,...
|
Ongoing, first activities started...
|