16 Green data centres
|
Implementation into fleet
|
Germany, USA, UK and others
|
last 5 years
|
A Driving Audible device for retrofitting onto non-ATO subway train to save traction energy
|
Retrofit measure, Pilot project
|
Hong Kong Special Administration...
|
It has taken around two years to...
|
11 Intelligent lighting management for railway depots
|
Pilot project
|
United Kingdom
|
For depots: implementation from...
|
Optimised Ventilation Control Re 4/4 II, Re 4/4 III
|
Retrofit measure, Implementation into fleet
|
Switzerland
|
End in 2004
|
20 The Carbon ladder - contractor involvement
|
Implementation into fleet
|
Netherlands
|
Developed and in use since 2009.
|
Savings on Coaches, Type Bpm
|
Retrofit measure, Pilot project
|
Switzerland
|
4 years
|
01 Heat pumps (geothermal, soil reservoir, air-based)
|
Implementation into fleet
|
Netherlands
|
2011- (ongoing)
|
13 Weather data based heating and cooling control of railway workshop
|
Pilot project
|
Germany
|
2009-2011
|
19 Using heat pumps for heating of switches
|
Implementation into fleet
|
Netherlands
|
2009-2011
|
07 Control of lighting (for stations, platforms, workshops, offices etc.)
|
|
Switzerland, Netherlands, Germany,...
|
2009 - present
|
12 Energy management for railway workshops
|
Implementation into fleet
|
Belgium, Germany, Netherlands,...
|
2006-2007 (for the SNCB project)
|
Choppers for Sprinter train sets
|
Retrofit measure
|
Netherlands
|
2003/04
|