   Bonus/penalty rules  evaluated  
Procurement contracts often foresee penalty payments for the case that certain requirements (e.g. maximum maintenance costs) are not fulfilled by manufacturers. So-called bonus / penalty rules, i.e. additional agreements on bonus payments for the case of "over-performance", could improve the role of energy-relevant parameters such as efficiency of traction equipment or mass per seat in the design of railway vehicles.
Technology field: Management and organisation
close main section General information
  open sub-section Description
close main section General criteria
  open sub-section Status of development: in use
  Time horizon for broad application: 2 - 5 years
  Expected technological development: not applicable
  Benefits (other than environmental): not applicable
  Barriers: medium
  Applicability for railway segments: high
    Type of traction:  electric - DC, electric - AC, diesel
    Type of transportation:  passenger - main lines, passenger - high speed, passenger - regional lines, passenger - suburban lines, freight
    Grade of diffusion into railway markets:
  Diffusion into relevant segment of fleet: not applicable
  Share of newly purchased stock: < 20%
  Market potential (railways): not applicable
close main section Environmental criteria
  open sub-section Impacts on energy efficiency:
  Energy efficiency potential for single vehicle: not applicable
  Energy efficiency potential throughout fleet: not applicable
  Other environmental impacts: positive
close main section Economic criteria
  open sub-section Vehicle - fix costs: not applicable
  Vehicle - running costs: not applicable
  Infrastructure - fix costs: not applicable
  Infrastructure - running costs: not applicable
  Scale effects: not applicable
  Amortisation: not applicable
no data available Application outside railway sector (this technology is railway specific)
close main section Overall rating
  open sub-section Overall potential: very promising
  Time horizon: mid-term
References / Links:  Dongen, Fiechter 2000
Attachments:
Related projects:  Bonus/Penalty Rules in weight reduction;  PROSPER (Procedures for Rolling Stock Procurement with Environmental Requirements)
Contact persons:
 date created: 2002-10-09
 
 
© UIC - International Union of Railways 2003
 
Aktionmenu
 
 Your contribution
   add technology
 Views of this page
   show overview
   show evaluation
   show details
 Print options
   print data sheet
   print screen
 Help
   Evaluation briefing
   Technology list
    French - German