| |
|
||||
| Project type: |
| Feasibility study |
| Company: |
| NS |
| Country: |
| Netherlands |
| Duration: |
| (no details available) |
| Project aims: |
| Assessment of potential for energy storage systems at NS Reizigers |
| Application area: |
| (no details available) vehicle(s) |
| Description: |
| The study examined the economic and technological feasibility of on-board and stationary energy storage systems in NS Reizigers DC network. The study showed a maximum theoretical saving potential of 6% of the total electricity consumption of the company. |
| References / Links: |
| Attachments: |
| Related technologies: Double-layer capacitors (storage technology); Stationary energy storage; Batteries (storage technology); Regenerative braking in DC systems; On-board energy storage in DC systems; Fly-wheels (storage technology) |
| Contact persons: |
| © UIC - International Union of Railways 2003 |