01 Heat pumps (geothermal, soil reservoir, air-based)
|
Implementation into fleet
|
Netherlands
|
2011- (ongoing)
|
02 Solar panels (PV) mounted on platform roofs, stations and/or workshops
|
Pilot project
|
Germany, UK, Netherlands
|
Ongoing (2012)
|
03 Upgrade of heating systems in stations, office buildings and workshops
|
Implementation into fleet
|
Netherlands, Belgium
|
Ongoing
|
04 SUS Station - Supporting Sustainable Stations (EU project)
|
Feasibility study
|
Germany, Netherlands, UK, France
|
17.4.2008 - 31.12.2013
|
05 Check lists for good practise examples for shops/concessions in stations
|
Feasibility study
|
Netherlands
|
Ongoing (2012)
|
06 Optimising electric equipment in stations
|
Implementation into fleet
|
Germany, Belgium, UK, Switzerland,...
|
Ongoing, first activities started...
|
07 Control of lighting (for stations, platforms, workshops, offices etc.)
|
|
Switzerland, Netherlands, Germany,...
|
2009 - present
|
08 Energy upgrade of buildings (offices, stations and workshops)
|
Implementation into fleet
|
Germany, Netherlands, Belgium, UK
|
1-3 years (2012)
|
09 Awareness campaigns for Energy Efficiency
|
Implementation into fleet
|
Belgium, Netherlands
|
Since 2008
|
10 Reuse of waste heat from workshops for district heating
|
Pilot project
|
Netherlands
|
Since 2010 (ongoing)
|
11 Intelligent lighting management for railway depots
|
Pilot project
|
United Kingdom
|
For depots: implementation from...
|
12 Energy management for railway workshops
|
Implementation into fleet
|
Belgium, Germany, Netherlands,...
|
2006-2007 (for the SNCB project)
|
13 Weather data based heating and cooling control of railway workshop
|
Pilot project
|
Germany
|
2009-2011
|
14 LED lighting systems for marshalling yards
|
Implementation into fleet
|
Switzerland
|
Pilot: 2010/2011, roll-out:...
|
15 LED lighting systems for signalling
|
Implementation into fleet
|
Netherlands
|
long-term project until 2020
|
16 Green data centres
|
Implementation into fleet
|
Germany, USA, UK and others
|
last 5 years
|
17 Energy efficient cooling of switch boxes
|
Pilot project
|
Switzerland
|
Started 2011 (free air cooling)
|
18 Control of switch heating
|
|
Switzerland, Austria, Netherlands,...
|
SBB: 2005- ongoing
ProRail: 2010...
|
19 Using heat pumps for heating of switches
|
Implementation into fleet
|
Netherlands
|
2009-2011
|
20 The Carbon ladder - contractor involvement
|
Implementation into fleet
|
Netherlands
|
Developed and in use since 2009.
|
A Driving Audible device for retrofitting onto non-ATO subway train to save traction energy
|
Retrofit measure, Pilot project
|
Hong Kong Special Administration...
|
It has taken around two years to...
|
Bogie fairings
|
R&D project
|
Germany, Italy, France
|
1996-2001
|
Bonus/Penalty Rules in weight reduction
|
Purchasing policy
|
Netherlands
|
|
Choppers for Sprinter train sets
|
Retrofit measure
|
Netherlands
|
2003/04
|
CO2-controlled ventilation
|
Retrofit measure, Pilot project
|
Netherlands
|
|
Contest Energy optimisation of "Metropolitan" trains
|
Pilot project, Feasibility study
|
Germany
|
2000-2001
|
Ecodriving
|
R&D project
|
Sweden
|
|
Economy Meter
|
Pilot project
|
Netherlands
|
2003
|
EnergieSparen (Energy saving)
|
Implementation into fleet
|
Germany
|
|
Energy chains of alternative fuels
|
Feasibility study
|
Germany
|
1999-2000
|
Energy Management System of New Coaches
|
Purchasing project
|
Switzerland
|
|
Energy meters
|
Pilot project
|
Italy
|
|
ESF
|
Implementation into fleet
|
Germany
|
|
Flytrain
|
Pilot project, R&D project
|
Germany
|
|
Fuel Cell
|
Feasibility study
|
Germany
|
|
High performance motor for direct drive
|
R&D project
|
Germany
|
|
High-speed co-operation project
|
R&D project
|
Italy/Germany
|
|
Hybrid vehicle
|
Feasibility study
|
Germany
|
1999-2000
|
Linear motor as a booster for freight operation
|
Feasibility study
|
Germany
|
|
Modifications in temperature and ventilation control
|
Implementation into fleet
|
Netherlands
|
|
Natural gas propelled railcar
|
R&D project
|
France
|
1 year, completed
|
New double-decked Regiorunners
|
Purchasing project
|
Netherlands
|
|
Opencell technology for railway applications
|
R&D project
|
Portugal
|
2 years
|
Optimised Ventilation Control Re 4/4 II, Re 4/4 III
|
Retrofit measure, Implementation into fleet
|
Switzerland
|
End in 2004
|
PLC system on parked trains
|
Pilot project
|
Sweden
|
|
PROSPER (Procedures for Rolling Stock Procurement with Environmental Requirements)
|
R&D project
|
International
|
02/2002-04/2003
|
Rail Flywheel Product - Los Angeles Metro
|
Purchasing project, Retrofit measure, Purchasing policy, Implementation into fleet, Pilot project, R&D project, Feasibility study
|
USA
|
Since 2014
|
Railcar with CNG propulsion
|
Pilot project
|
Germany
|
|
Savings on Coaches, Type Bpm
|
Retrofit measure, Pilot project
|
Switzerland
|
4 years
|
Shunting locomotive with LNG propulsion
|
Pilot project
|
Germany
|
1996-2002
|
Software to reduce energy consumption of parked trains
|
Retrofit measure, Implementation into fleet
|
Denmark
|
|
Studies performed on energy storage systems
|
Feasibility study
|
Netherlands
|
|
TEMA (=Traktions-Energie Messung und Abrechnung)
|
Implementation into fleet
|
Germany
|
2000-2004
|
THALES: hybrid tram train with on-board ultracapacitors
|
R&D project
|
France
|
Start: 12/2000
|
The purchase of the new Copenhagen S-trains
|
Purchasing project
|
Denmark
|
1990-today
|